Engineering

発電機同期運転

The process of matching the voltage, frequency, and phase of an incoming generator to the busbar before connecting it in parallel with the existing power supply.

Quick answer: The process of matching the voltage, frequency, and phase of an incoming generator to the busbar before connecting it in parallel with the existing power supply.

This term page is part of the Protermify Maritime glossary and is published as static HTML for fast indexing and clear language coverage.

Languages

Quick answer

The process of matching the voltage, frequency, and phase of an incoming generator to the busbar before connecting it in parallel with the existing power supply.

Why it matters

発電機同期運転 matters because it supports clear communication in Engineering contexts for Deck Officers, Engine Officers, and Masters. It also connects to aviation training and exam language such as STCW, Marlins Test, ISF Watchkeeper, and GMDSS.

Editorial context

This page is rendered as static HTML from source-backed terminology data so search engines and AI systems can parse the content without client-side code.

Questions and answers

Questions and answers

What is 発電機同期運転?

In this glossary, 発電機同期運転 refers to: The process of matching the voltage, frequency, and phase of an incoming generator to the busbar before connecting it in parallel with the existing power supply.

How is 発電機同期運転 used in maritime?

In maritime communication, this term appears in contexts such as: "遮断器を閉じる前に、発電機同期指示器が一致していることを確認し、当直機関士に報告してください。"

Why does 発電機同期運転 matter in maritime?

発電機同期運転 matters because it supports clear communication in Engineering contexts for Deck Officers, Engine Officers, and Masters. It also connects to aviation training and exam language such as STCW, Marlins Test, ISF Watchkeeper, and GMDSS.

Who uses 発電機同期運転?

発電機同期運転 is mainly used by Deck Officers, Engine Officers, and Masters.

What category does 発電機同期運転 belong to?

In this glossary, 発電機同期運転 is grouped under Engineering. Related pages in this category explain adjacent procedures, commands and operational concepts.

Where does this definition come from?

This definition is sourced from IMO SMCP, STCW Convention, SOLAS, COLREG and published by Protermify Maritime as a static maritime reference page.

Definition

The process of matching the voltage, frequency, and phase of an incoming generator to the busbar before connecting it in parallel with the existing power supply.

Operational example

Before closing the breaker, verify generator synchronization indicators are aligned and report to the duty engineer.

Localized term

発電機同期運転

Localized example

遮断器を閉じる前に、発電機同期指示器が一致していることを確認し、当直機関士に報告してください。

Definition language

English reference definition

Source

IMO SMCP, STCW Convention, SOLAS, COLREG

Category

Engineering

Exam relevance

  • STCW
  • Marlins Test
  • ISF Watchkeeper
  • GMDSS

Target audience

  • Deck Officers
  • Engine Officers
  • Masters

Related terms

Use the related links below to continue through connected maritime terminology.

Back to glossary

Termify Get Termify on the App Store OPEN
AI Free AI Search Source-backed aviation answers