Basic ATC

允许推出并启动发动机

ATC clearance authorizing an aircraft to begin pushback from the gate and start engines.

Quick answer: ATC clearance authorizing an aircraft to begin pushback from the gate and start engines.

This term page is part of the Protermify Aviation glossary and is published as static HTML for fast indexing and clear language coverage.

Languages

Quick answer

ATC clearance authorizing an aircraft to begin pushback from the gate and start engines.

Why it matters

允许推出并启动发动机 matters because it supports clear communication in Basic ATC contexts for Pilots, Air Traffic Controllers, and Cabin Crew. It also connects to aviation training and exam language such as ICAO Level 4, ICAO Level 5, ICAO Level 6, and EASA FCL.055.

Editorial context

This page is rendered as static HTML from source-backed terminology data so search engines and AI systems can parse the content without client-side code.

Questions and answers

Questions and answers

What is 允许推出并启动发动机?

In this glossary, 允许推出并启动发动机 refers to: ATC clearance authorizing an aircraft to begin pushback from the gate and start engines.

How is 允许推出并启动发动机 used in aviation?

In aviation communication, this term appears in contexts such as: "推出和启动获批,预计五分钟内给予滑行许可。"

Why does 允许推出并启动发动机 matter in aviation?

允许推出并启动发动机 matters because it supports clear communication in Basic ATC contexts for Pilots, Air Traffic Controllers, and Cabin Crew. It also connects to aviation training and exam language such as ICAO Level 4, ICAO Level 5, ICAO Level 6, and EASA FCL.055.

Who uses 允许推出并启动发动机?

允许推出并启动发动机 is mainly used by Pilots, Air Traffic Controllers, and Cabin Crew.

What category does 允许推出并启动发动机 belong to?

In this glossary, 允许推出并启动发动机 is grouped under Basic ATC. Related pages in this category explain adjacent procedures, commands and operational concepts.

Where does this definition come from?

This definition is sourced from ICAO Doc 9432, FAA PCG and published by Protermify Aviation as a static aviation reference page.

Definition

ATC clearance authorizing an aircraft to begin pushback from the gate and start engines.

Operational example

Pushback and start approved, expect taxi clearance in five minutes.

Localized term

允许推出并启动发动机

Localized example

推出和启动获批,预计五分钟内给予滑行许可。

Definition language

English reference definition

Source

ICAO Doc 9432, FAA PCG

Category

Basic ATC

Exam relevance

  • ICAO Level 4
  • ICAO Level 5
  • ICAO Level 6
  • EASA FCL.055

Target audience

  • Pilots
  • Air Traffic Controllers
  • Cabin Crew

Related terms

Use the related links below to continue through connected aviation terminology.

Back to glossary