MEL and CDL MEL and CDL

Ожидается поставка деталей

Maintenance action deferred because required replacement part is not yet available in inventory or supply chain.

Quick answer: Maintenance action deferred because required replacement part is not yet available in inventory or supply chain.

This term page is part of the Protermify Aviation glossary and is published as static HTML for fast indexing and clear language coverage.

Languages

Quick answer

Maintenance action deferred because required replacement part is not yet available in inventory or supply chain.

Why it matters

Ожидается поставка деталей matters because it supports clear communication in MEL and CDL MEL and CDL contexts for Pilots, Air Traffic Controllers, and Cabin Crew. It also connects to aviation training and exam language such as ICAO Level 4, ICAO Level 5, ICAO Level 6, and EASA FCL.055.

Editorial context

This page is rendered as static HTML from source-backed terminology data so search engines and AI systems can parse the content without client-side code.

Questions and answers

Questions and answers

What is Ожидается поставка деталей?

In this glossary, Ожидается поставка деталей refers to: Maintenance action deferred because required replacement part is not yet available in inventory or supply chain.

How is Ожидается поставка деталей used in aviation?

In aviation communication, this term appears in contexts such as: "Ремонт отложен, так как заменяющий клапан отмечен как ожидающий поставки в журнале ТО."

Why does Ожидается поставка деталей matter in aviation?

Ожидается поставка деталей matters because it supports clear communication in MEL and CDL MEL and CDL contexts for Pilots, Air Traffic Controllers, and Cabin Crew. It also connects to aviation training and exam language such as ICAO Level 4, ICAO Level 5, ICAO Level 6, and EASA FCL.055.

Who uses Ожидается поставка деталей?

Ожидается поставка деталей is mainly used by Pilots, Air Traffic Controllers, and Cabin Crew.

What category does Ожидается поставка деталей belong to?

In this glossary, Ожидается поставка деталей is grouped under MEL and CDL MEL and CDL. Related pages in this category explain adjacent procedures, commands and operational concepts.

Where does this definition come from?

This definition is sourced from ICAO Doc 9432, FAA PCG and published by Protermify Aviation as a static aviation reference page.

Definition

Maintenance action deferred because required replacement part is not yet available in inventory or supply chain.

Operational example

Repair is pending as the replacement valve is listed as parts awaiting supply in the technical log.

Localized term

Ожидается поставка деталей

Localized example

Ремонт отложен, так как заменяющий клапан отмечен как ожидающий поставки в журнале ТО.

Definition language

English reference definition

Source

ICAO Doc 9432, FAA PCG

Exam relevance

  • ICAO Level 4
  • ICAO Level 5
  • ICAO Level 6
  • EASA FCL.055

Target audience

  • Pilots
  • Air Traffic Controllers
  • Cabin Crew

Related terms

Use the related links below to continue through connected aviation terminology.

Back to glossary