MEL and CDL MEL and CDL

延期不具合報告

A formal record noting a defect which has been deferred under MEL/CDL procedures, including details of rectification plan and interval.

Quick answer: A formal record noting a defect which has been deferred under MEL/CDL procedures, including details of rectification plan and interval.

This term page is part of the Protermify Aviation glossary and is published as static HTML for fast indexing and clear language coverage.

Languages

Quick answer

A formal record noting a defect which has been deferred under MEL/CDL procedures, including details of rectification plan and interval.

Why it matters

延期不具合報告 matters because it supports clear communication in MEL and CDL MEL and CDL contexts for Pilots, Air Traffic Controllers, and Cabin Crew. It also connects to aviation training and exam language such as ICAO Level 4, ICAO Level 5, ICAO Level 6, and EASA FCL.055.

Editorial context

This page is rendered as static HTML from source-backed terminology data so search engines and AI systems can parse the content without client-side code.

Questions and answers

Questions and answers

What is 延期不具合報告?

In this glossary, 延期不具合報告 refers to: A formal record noting a defect which has been deferred under MEL/CDL procedures, including details of rectification plan and interval.

How is 延期不具合報告 used in aviation?

In aviation communication, this term appears in contexts such as: "航空機の出発前に延期不具合報告を完了する必要があります。"

Why does 延期不具合報告 matter in aviation?

延期不具合報告 matters because it supports clear communication in MEL and CDL MEL and CDL contexts for Pilots, Air Traffic Controllers, and Cabin Crew. It also connects to aviation training and exam language such as ICAO Level 4, ICAO Level 5, ICAO Level 6, and EASA FCL.055.

Who uses 延期不具合報告?

延期不具合報告 is mainly used by Pilots, Air Traffic Controllers, and Cabin Crew.

What category does 延期不具合報告 belong to?

In this glossary, 延期不具合報告 is grouped under MEL and CDL MEL and CDL. Related pages in this category explain adjacent procedures, commands and operational concepts.

Where does this definition come from?

This definition is sourced from ICAO Doc 9432, FAA PCG and published by Protermify Aviation as a static aviation reference page.

Definition

A formal record noting a defect which has been deferred under MEL/CDL procedures, including details of rectification plan and interval.

Operational example

The deferred defect report must be completed before the aircraft is dispatched.

Localized term

延期不具合報告

Localized example

航空機の出発前に延期不具合報告を完了する必要があります。

Definition language

English reference definition

Source

ICAO Doc 9432, FAA PCG

Exam relevance

  • ICAO Level 4
  • ICAO Level 5
  • ICAO Level 6
  • EASA FCL.055

Target audience

  • Pilots
  • Air Traffic Controllers
  • Cabin Crew

Related terms

Use the related links below to continue through connected aviation terminology.

Back to glossary